Minnesota Department of Transportation

511 Travel Info

Research & Innovation

Project Search

Return to Main Site

Continued Monitoring of Stormwater Effluents from Filter Media in Two Bioslope Sites

Status:  Active
Project Start Date:  08/22/2019

Summary:

Two bioslopes using salvage materials were monitored as part of two previous MnDOT funded projects. Soil moisture and water quality were monitored for two years at Natural Resources Research Institute test plots as part of the first project and two months at the Highway 169 Eagle's Nest project for the second project. Because of the short monitoring period, current data did not give any clear temporal trend to estimate aging effects of infiltration media. Therefore extended monitoring is proposed for another two years (July 2019 to June 2021) in order to assist in the understanding of long term retention and stormwater treatment capacity by salvage materials. The monitoring results together with data from previous projects can provide information for the future design and application of salvage materials in stormwater treatment in bioslope/ bioswale as well as a soil amendment. Data gathered will assist in evaluating the amount of materials to be used in a mix, and the life time of the application.

Final Deliverables:

Related Materials: