2011 MnROAD Mainline Concrete Construction: Cells 5, 6 and 63 Status: CompleteReport Date: 12/11/2012 Summary: In September 2011, MnDOT constructed two cells in the MnROAD Mainline in continuation of the study of unbonded overlay (Cell 5) and to facilitate studies on a drainable base (Cell 6) with a longitudinal tined texture. Additionally, roller compacted concrete shoulders were constructed in these cells, to replace the preexisting asphalt shoulders. Finally, repairs were done to a thin concrete overlay of existing asphalt pavement installed in 2004 (Cell 63). This report discusses the construction procedure, instrumentation, and the initial monitoring from these test cells. Final Deliverables: Report #2012-37 Related Materials: Related Research: