Bridge Pile Repair Using Underwater FRP Sleeve and Steel Reinforced Grout

Status:  Active
Project Start Date:  05/06/2022

Summary:

This project aims to explore a bridge pilings repair method that requires no dewatering. This project will assess whether this method is a feasible and acceptable method for timely bridge piling repairs in Minnesota.

Final Deliverables:


Related Materials:


Related Research: