Debonded Strands in Prestressed Concrete Bridge Girders | 2019 | 2019-30
|
Investigation of Shear Distribution Factors in Prestressed Concrete Girder Bridges | 2016 | 2016-32
|
Effect of Temperature on Prestressed Concrete Bridge Girder Strand Stress During Fabrication | 2015 | 2015-50
|
Anchorage of Shear Reinforcement in Prestressed Concrete Bridge Girders | 2014 | 2014-36
|
Modeling and Monitoring the Long-Term Behavior of Post-Tensioned Concrete Bridges | 2014 | 2014-39
|
Instrumentation, Monitoring, and Modeling of the I-35W Bridge | 2012 | 2012-24
|
Validation of Prestressed Concrete I-Beam Deflection and Camber Estimates | 2012 | 2012-16
|
Full-Depth Precast Concrete Bridge Deck System: Phase II | 2012 | 2012-30
|
Discrepancies in the Shear Strength of Prestressed Beams with Different Specifications | 2010 | 2010-03
|
Validating Mn/DOT's Precast Composite Slab Span System | 2008 | 2008-41
|
Application of Precast Decks and Other Elements to Bridge Structures | 2006 | 2006-37
|
Retrofitting Shear Cracks in Reinforced Concrete Pier Caps Using Carbon Fiber Reinforced Polymers | 2005 | 2005-13
|
Behavior of Concrete Integral Abutment Bridges | 2004 | 2004-43
|
Effects of Vertical Pre-Release Cracks on Prestressed Bridge Girders | 2003 | 2003-33
|
Release Methodology of Prestressing Strands | 2000 | 2000-09
|
Effects of Pre-Release Cracks in High-Strength Prestressed Girders | 2000 | 2000-25
|