Development of Dynamic Route Clearance Strategies for Emergency Vehicle Operations, Phase I | 2023 | 2003-27
|
Evaluation of Metro Freeway System for Reliability and Resilience | 2022 | 2022-01
2022-01A
|
Development of a Road Condition Recovery Time Estimation System for Winter Snow Events | 2018 | 2018-01
|
Development of Travel Time Reliability Measurement System | 2018 | 2018-28
|
Development of a Guideline for Work Zone Diversion Rate and Capacity Reduction | 2016 | 2016-12
|
Automatically Measuring Traffic Recovery Times After Snowstorms | 2015 | 2015-44
|
Improved Active Traffic Management Strategies Make Travel Smoother on Twin Cities Freeways | 2015 | 2015-26
|
Development of Freeway Operational Strategies with IRIS-in-Loop Simulation | 2012 | 2012-04
|
Estimation of Winter Snow Operation Performance Measures with Traffic Data | 2012 | 2012-40
|
Development of Operational Strategies for Travel Time Estimation and Emergency Evacuation on a Freeway Network | 2004 | 2004-49
|
Dynamic Estimation of Freeway Weaving Capacity for Traffic Management and Operations, Phase II | 2003 | 2003-32
|
Signal Operations Research Laboratory For Development And Testing Of Advanced Control Strategies, Phase II | 2003 | 2003-01
|
Capacity Analysis for Dynamic Bottlenecks and Alternative Concepts for Coordinated Ramp Metering Operations | 2002 | 2002-09
|
Technical support for implementation of freeway network simulation software | 2001 | 2001-03
|