Development and Integration of Advanced Timber Bridge Inspection Techniques for NBISStatus: CompleteReport Date: 01/29/2015 Summary: Researchers identified state-of-the-art timber bridge inspection techniques and equipment to give local engineers more accurate information about the condition of their timber bridges. This can help extend bridge service life by saving money in replacement costs and reducing detours or weight limit reductions. MnDOT has purchased three sets of inspection equipment for local agencies to borrow, and it will update its bridge inspection training materials to incorporate this information. Final Deliverables: Development and Integration of Advanced Timber Bridge Inspection Techniques for NBIS (Report #2015-01) Timber Bridge Life Spans Extended with Innovative Inspection Devices (Research Summary) Related Materials: Timber Bridge Inspection: Resistance Microdrilling Demonstration (Video/Webinar) Timber Bridge Inspection: Stress Wave Timer Demonstration (Video/Webinar) High-Tech Inspections Keep Minnesota's Timber Bridges Safe (Blog Post) Related Research: 2015-45A: Development of Cost-Effective Timber Bridge Repair Techniques for Minnesota 2015-45B: Cost-Effective Timber Bridge Repairs: Manual for Repairs of Timber Bridges in Minnesota Cost-Competitive Timber Bridge Designs for Long-Term Performance Development and Integration of Advanced Timber Bridge Inspection Techniques for NBIS Purchase Equipment and Train Users Load and Resistance Factor Design (LRFD) Pile Driving Project - Phase II Study Developing Flexural Vibration Inspection Techniques for Wooden Bridges Development of Flexural Vibration Inspection Equipment, Techniques to Assess Structural Health of Rural Bridge Sys II. Load and Resistance Factor Design (LRFD) Pile Driving Project-Phase II Study Development of Cost-effective Timber Bridge Repair Techniques for Minnesota Development and Integration of Advanced Timber Bridge Inspection Techniques for NBIS purchase Equipment and Train Users Cost-competitive Timber Bridge Designs for Long Term Performance Project Personnel: Principal Investigator: Brian Brashaw Technical Liaison: David Conkel Project Coordinator: Daniel Warzala Panel Members: Ahman Abu-Hawash - Bridges and Structures Alan Forsberg - Alan Rindels - Metro District Art Johnston - USDA Forest Service, Retired Brent Phares - Iowa State University/CTRE Brian Brashaw - University of Minnesota Duluth Brian Keierleber - Buchanan County Engineer Christopher Werner - HDR Engineering, Inc. Daniel Dorgan - HDR Engineering, Inc. Greg Isakson - Goodhue County James Wacker - USDA Forest Service Jim Grothaus - Hancock Concrete John Welle - Aitkin County Mark Dunn - Iowa Department of Transportation Mark Nahra - Woodbury County Engineer Matthew Hemmila - St. Louis County Robert Vatalaro - U of M Duluth Susan Miller - SRF