Assessing The Capacity of Four Steel Hinges Extracted from Existing BridgesStatus: ActiveProject Start Date: 09/12/2025Subscribe for Updates Summary: Girder hinge connection details are susceptible to corrosion and stress concentrations that can lead to reduced capacities in steel bridges. MnDOT has recently replaced and salvaged four girder hinges with the goal of testing to investigate their actual capacities and the accuracy of the results of the numerical models. Final Deliverables: Related Materials: Related Research: Project Personnel: Principal Investigator: Pedram Mortazavi Technical Liaison: Yihong Gao Project Coordinator: Marcus Bekele Panel Members: Braden Cyr - Bridges David Conkel - Bridges Enhui Tan - Bridges Moises Dimaculangan - Bridges